2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Bla C ity Hall prior to Final Inspecti
21 S P Street, Bl NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance w ith the following qul en
f2gowd= this reroofing Job.
Property as °
Contractor or Homeowner (If self):
p ermit #a - 1
Ins llation Da I be 6 I
S ,
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION i T LLE : An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.9)
S TRUCTURAL CC _P _ T A N ® The structural roof components are
capable of supporting the roof covering system and the material and equipment loads i
that will be encountered during installation of the roof covering system. (11907.2)
EYJS TING COVERING WAS REMOVE Existing roof covering was removed for one
of the reasons required by section 8907.3
D ID T USE RUSTED METAL OR FLASHING, Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (8907.5)
FLASHING INSTALLED P PE LY: Flashing shall be reconstructed in accordan
with approved manufacturer's installation instructions. Metal flashing to which
bitumin s materials are to be adhered shall be primed prior to Installation. (11907.5)
Signature of Primary Installer ate