Checkoff Sheet MS-2014-01782.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
I I
Return to Blair City Hall prior to Final inspection
218 S ie street, Blair, NE 68008
Because o f limitations caused by the infeasibility to perform detailed Inspections which would
w wi rem te
not Interfere with reroofing work, please indicate compliance i th the folio ng re an
following this reroofing job.
Property Address:
Contractor or Homeowner (if self)
Permit #-.
installation Date: —J ��
YES / NO the existing
The materials and methods of application used for recovering or re
roof covering comply with the requirements of the building code. (8907.1)
ICE PROT. ECTION INST_ALLED: An ice barrier that consists of at least two IaYsTs Of
undedayment or of a self-adhering polymer modified bitumen sheet wa§ installed and
extends to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1
STRUCTURAL COMPONEN TSAR K129M The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EYJSTINQ COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
_DID NOT USE R_USTED ! ', ME L L.P Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8.907-5)
ROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
biturnin s materials are to be adhered shall be primed prior to installation. (8907.6)
s i gn a of primary
e of Primary Installer ate
zi,2 1:10 1 A
Date
Signatu*rof of �Ho e�r