Loading...
Checkoff Sheet MS-2014-01782.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET I I Return to Blair City Hall prior to Final inspection 218 S ie street, Blair, NE 68008 Because o f limitations caused by the infeasibility to perform detailed Inspections which would w wi rem te not Interfere with reroofing work, please indicate compliance i th the folio ng re an following this reroofing job. Property Address: Contractor or Homeowner (if self) Permit #-. installation Date: —J �� YES / NO the existing The materials and methods of application used for recovering or re roof covering comply with the requirements of the building code. (8907.1) ICE PROT. ECTION INST_ALLED: An ice barrier that consists of at least two IaYsTs Of undedayment or of a self-adhering polymer modified bitumen sheet wa§ installed and extends to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1 STRUCTURAL COMPONEN TSAR K129M The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EYJSTINQ COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 _DID NOT USE R_USTED ! ', ME L L.P Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8.907-5) ROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which biturnin s materials are to be adhered shall be primed prior to installation. (8907.6) s i gn a of primary e of Primary Installer ate zi,2 1:10 1 A Date Signatu*rof of �Ho e�r