Loading...
Checkoff Sheet MS-2014-01781.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET I I Return to Blair City Hall prior to Final inspection 218 S i6 Street, Blair, NE 68008 B of limitations caused by the Infeasibility to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, Property Address: Contractor or Homeowner (if self) Permit#- Installation Date: YES NO C 3 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED'. An ice barrier that consists of at least two layers of undedayment or of a self-adhering polymer modified bitumen sheet was install 9A and extends at least from the eavds edge to a point at least 24 inches inside, the exterior wall line of the building, (8905.2.7 STRUCTURAL COMPONENIS_.ARE SOUND The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) Exis — CoVERING WAS REMOVE Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUST E ETAL OR ELASHING; Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5) FLAS Hl I TALL E LY® Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bitumin , materials are to be adhered shall be primed prior to installation. (11907.6) Si "'Um e of Primary — Installer ate 1,2b %,\ i LOAL I I -A S i gna ture �— , P Holder Date I