Checkoff Sheet MS-2014-01781.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
I I
Return to Blair City Hall prior to Final inspection
218 S i6 Street, Blair, NE 68008
B of limitations caused by the Infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job,
Property Address:
Contractor or Homeowner (if self)
Permit#-
Installation Date:
YES NO
C 3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
ICE PROTECTION INSTALLED'. An ice barrier that consists of at least two layers of
undedayment or of a self-adhering polymer modified bitumen sheet was install 9A and
extends at least from the eavds edge to a point at least 24 inches inside, the exterior
wall line of the building, (8905.2.7
STRUCTURAL COMPONENIS_.ARE SOUND The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
Exis — CoVERING WAS REMOVE Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUST E ETAL OR ELASHING; Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5)
FLAS Hl I TALL E LY® Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bitumin , materials are to be adhered shall be primed prior to installation. (11907.6)
Si "'Um
e of Primary — Installer ate
1,2b %,\ i
LOAL I
I -A
S i gna ture �— , P Holder Date
I