Checkoff Sheet MS-2014-01778.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218S16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perlbrm detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the folio g requirements
folio in this reroofing job.
Property Address; I :1-b-6 -J
Contractor or Homeowner (itself)
Permit #: MS-20
installation Date: ilk
C �
Y9 NO
C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply With the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLEQ: An ice barrier that consists of at least two layers of
undarlayment or of a self-adhering polymer modified bitumen sheet was _installed and
extends at least from the eayg! �ed e. to a point at least 24 inches inside the exterior
wall line of the building, (8905.2.7.1)
C3 STRUCTU L COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
E&S_TING COVERING WAS REMOVED- Existing roof covering was removed for one
of the reasons required by section 8907.3
C3 DID NOT USE ,RUSTED METAL OR FLASHIM: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted, (8907.5)
FLASHING INSLALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
atur of v Ins
sWfu of imary installer ate
Q& L,
Date
S Permit Holder