Checkoff Sheet MS-2014-01776.tif i'
i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return I it City Hall prior to i l Inspection
218S I 1h Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perforrn detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following ul men
following
this reroofing job.
Property s:
Contractor or homeowner (if self)
Permit*. I
I
Installation Dater
Yt NO
C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION _INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least L4, inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL CO 7' A E SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTINr. COVERING A REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHI Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (R907.6)
FLASHING INSTALLED PftOPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
itu inous mate' Is are to be adhered shall be primed prior to installation. (11907.5)
i
r
Signature of Primary Installer 6ate y
Signatu of Permit Holder Date
i
i
i