Loading...
Checkoff Sheet MS-2014-01525.tif 009 INTERN RESI DENTIAL � CITY F LAIR REROOFING CHECKOFF SHEET Return to Blair Cn y Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 h would i Because of limitations caused by the infeasibility to perform �ancedwi inspections whic owing requirements I, not interfere with reroofing work, please indicate comp followin this reroofing job. C 6 e7 ��u 1 1 Property Address: N/ Contractor or Homeowner (if self) Permit #: MS-20 ° Installation Date: YE NO Q ❑ The materials and 'methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that t consists itumen sheet avas sta installed of and � underlayment or of aself- adhering polymer modified extends at le_ the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SO ste and the material and equipment loads capable of supporting the roof covering sy that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one ® of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING re not led f rust de(R907g5) drain outlets, collars or metal counter - flashing FLASHING INSTALLED PROPERLY: Flashing shall be recon shin t to in a c with approved manufacturer accordance ® 's installation instructions. Metal fla g bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date Signature of Primary Installer Date Si �'ature �of er mit Holder