Checkoff Sheet MS-2014-00700.tif I j
I
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to it t o It prior Final Inspection
218 S Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing jobs
Property ss® 1
Contractor or Homeowner (if sel f 1 i
I
e it #:
Installation ate:
YES i
N
'tCY C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
OjAd IC T C'TI I T L : An ice barrier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
T UCLU L T a The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
I
EYJSTING COVERING V Existing roof covering was removed for one
of the reasons required by section 8907.3
D ID NOT USE RUSTED 1 Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED P Llf4 dashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
i
-signature of Primary Installer Data
Signature 61 permit Holder Date