Checkoff Sheet MS-2014-00262.tif I
I
i
2009 INTERNATIONAL RESIDENTIAL CODE
i
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return I it to prior Final Inspection
218S I St reet, B lair, NE 68008
B ecause of limita caused by the Infeasibility to perform detailed inspections which would
not Interfere reroofing work, please indicate compliance with the following requirements
folio in this re roofing job.
P rop erty r s°
I
C ontractor or Homeowne (if self)
Pe it a$7
Installation ate:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALL An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS & e The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EYJS TING COVERING WA5 V : Existing roof covering was removed for one
of the reasons required by section 8907.3
D ID NOT USE RUSTED L QR FL I : iExisdng vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
0 C3 FLASHING INSTALLED PROPERL Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
d 'Z ... 4� 0,940 Z Wa
Signature of primary Ins 11 at
d % 1wUf t
Signat� of Pertt-it older Date
i