Loading...
Checkoff Letter MS-2014-01168.tif i ' s i TQ �.ATY U o Ise of a I Astro Buildings, Inc. April 30, 2015 1109 S 19th Suite A Omaha NE 68108 i Permit Number: MS- 2014 -01168 Roof, walls on three metal Astro buildings. No work on the house on this permit. i I Permit Address: 14048 Cord 28 I Dear Contractor, The Roofing Inspection for the above referenced permit has passed inspection, but no Roofing Checkoff Sheet has been turned in for this permit. A signed Roofing Checkoff Sheet is required as certification that ail work was performed in accordance with the 2009 Building Code. A blank Roofing Checkoff Sheet is enclosed for your convenience. Please complete the form immediately and return it by email (stormdamage @ci.blair.ne.us), by fax (402.426.4195) or by mail (218 S 16th St, Blair, NE, 68008). j I If you do not return a completed Roofing Checkoff Sheet within 60 days of the date of this notice, you will forfeit the $50.00 deposit associated with this permit and we will turn this issue over to the City of Blair Licensing Board and City Attorney to consider suspending your contractor registration. If you have questions about the Roofing Checkoff Sheet, please call the Blair Building Department at 402.426.4191. Thank you in advance foryour cooperation in this matter. Sincerely, Phil Green Assistant City Administrator 218 South 16th Street . Blair, Nebraska 68008 402- 426 -4191 • Fax 402 - 426 -4195. E -mail cityofblair @ci,blalr.ne,Lis