Loading...
Checkoff Sheet MS-2014-03186.tif I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET i Re tu rn i t i ll Nor to Final inspection f 218 S I 6 $treet, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform defamed inspections which would j not interfere with reroofing work, please indicate compliance with the following r equirements � 121!2Mt1gg this reroofing job. ; Permit Installation Date: I ; YES NO The materials and methods of application used for recovering or replacing the existing 1 roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLS An ice barrier that consists of at least two layers of � underlayment or of a self adhe0ng polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the b (8905..7.1) i i STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS { E CVE p Existing roof covering was removed for one of the reasons required by section 8907.3 c C RUSTED M OR FLA Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5) i FLASHING INSTALLED R PE LY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be 'adhered shall be primed prior to installation. (8907.6) 't Signature of Primary Installer bate i 1 3f d Signature of Permit Holder Date