Checkoff Sheet MS-2014-02965.tif j
1
2009 INTERNATIONAL RESID NTIAL CODE
j
CITY OF BLAIR RER�OFING CH CKOFF SHEET
Return to B lair City prior to F' al Inspection
218 16 th greet, Blair, 68008 �
Because of limitations caused by the infeasibility to perf rm detailed inspections which would
not interfere with reroofing work, please indicate compy nce with the following requirements
` I
following this reroofing job.
Permit
Installation Date;
I
YES NO
The materials and methods of ( application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least �installe o Je of j
underlayment or of a self- adhering polymer modified bitumen sheet was nd
extends at least from the eave's ed e to a point' at least 24 inches inside the or
wall line of the building. (R905. ?.7.1)
STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during; installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907,3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter. were not reinstalled if rusted. (R907.5)
I
FLASHING INSTALLED PROI�Y: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
i
lid6aiue of Permit Holder �� Date
1