Loading...
Checkoff Sheet MS-2014-02374.tif i 04/27/2015 09:05 FAX 4025332173 0001/001 CITY OF BLAIR REROOFING CHECKOFF SHEET i I i Return to Blair Ci y Hall prior to Final Inspection 218 S i street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing ( ' b. Address. Property Add�rB I Contractor or Homeowner (if self) : J Permit #: MS -20 �'�f _ � Installation Date: I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907 ICE PRIOTECTIt0N INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet w s installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) I STRUCTURAL COMPONENTS ARE SOUND: The structure) roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) EXIS COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.� DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, i drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i FLASHIN INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.8) 1 47 M re of Prlmarl Insta er Data Date Signature of Permit Holder i i I