Loading...
Checkoff Sheet MS-2014-02368.tif APR -26 -2015 05:43 From:5amsung Fax 7126443668 To:14024264195 Pagel /l 2009 INTERNATIO'NAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET I I i i i Re turn to lair City Hall prior to Final Inspection 218 16t" S treet, lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would r not interfere with reroofing work, please indicate compliance with the following requirements followiM this reroofing Job. Property Address: --- `�- Contractor or Homeowner (if self) ; permit #; - 20 _ � - -- - • -- - -• - - -•- •,--__ ._. _ - _ • - -- - . Installation Date: [ , Jy YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTE CTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's_edpe to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads ' that will be encountered during installation of the roof covering system. (8997.2) _ _ EXISTING COVERING WAS REMOVED: Existing roo� covering was removed for one of the reasons required by section 8907.3 i DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (R907.6) i Zl- 2 41 Signat re of Primary I taller Date Signature ermit Holder �• bate