Checkoff Sheet MS-2014-02368.tif APR -26 -2015 05:43 From:5amsung Fax 7126443668 To:14024264195 Pagel /l
2009 INTERNATIO'NAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
I
I
i
i
i
Re turn to lair City Hall prior to Final Inspection
218 16t" S treet, lair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
r
not interfere with reroofing work, please indicate compliance with the following requirements
followiM this reroofing Job.
Property Address: --- `�-
Contractor or Homeowner (if self) ;
permit #; - 20 _ � - -- - • -- - -• - - -•- •,--__ ._. _ - _ • - -- - .
Installation Date: [ , Jy
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTE CTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's_edpe to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads '
that will be encountered during installation of the roof covering system. (8997.2)
_ _ EXISTING COVERING WAS REMOVED: Existing roo� covering was removed for one
of the reasons required by section 8907.3
i
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
i
Zl- 2 41
Signat re of Primary I taller Date
Signature ermit Holder �• bate