Loading...
Checkoff Sheet MS-2014-01870.tif i 2009 INTERNATIONA CODE Return to Blair City Hall prior to Final Inspection 218 S 16 Str eet i- Blair NE 68008 � Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin th reroofing job. I �( Permit #: ► Y ` 7 ��-( "" �( "�� 1 I Installation Date: 5 �� I YEF NO J Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) d 1] ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave' edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) [] EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance f with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i Sign' of Pr' arinstaller Date Date S Permit Holder i I f