Checkoff Sheet MS-2014-01870.tif i
2009 INTERNATIONA
CODE
Return to Blair City Hall prior to Final Inspection
218 S 16 Str eet i-
Blair NE 68008 �
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin th reroofing job. I �(
Permit #: ► Y ` 7 ��-( "" �( "�� 1
I
Installation Date: 5 ��
I
YEF NO
J Q The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
d 1] ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave' edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
[] EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
f
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i
Sign' of Pr' arinstaller Date Date
S Permit Holder