Checkoff Sheet MS-2014-01805.tif i
AR r, 27. 2015 2; 41 PM No. 1068 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
v
�
CITY '10F LAI
Return to Blair City Hall prior to inal inspection
218 S 16 Street, Blair, N E 68008
Because of limitations caused by the Infeasibility to perfor in detailed inspections which would
not interfere wlth reroofing work, please indicate compliar ce with the foilowing requirements
foilvuvina this reroofing job.
Property Address: pw-, ` -
Contractor or Homeowner (If self) : 4
p
Installation Date:
YE"O
The materials and methods of application used for recovering or replacing the existing
root covering comply with the requirements ' of the building code. (R907.1)
0 ICE PRO TECTION INSTALLEb: An ice barrier t at consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7,1)
I
STRUCTURAL COMPONENTS ARE SOUND: T ie structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the i oof covering system. (14907.2)
EXISTING COVERING WAS REMOVED: EAstin roof covering was removed for one
of the reasons required by section 8907.3
i
Q DID NOT USE RUSTED METAL OP FLASHING Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing we a not reinstalled if rusted. (R907.5)
_... __.
FLASHING INSTALLED PRORERLY: Flashing s ail be reconstructed in accordance
with approved manufacturer's installation instructions, Metal flashing to which
bituminous materials are to be adhered shall be la imed prior to installation. (8907.6)
Signa f Primary Installer ate
i
Signature of Permit Holder date