Loading...
Checkoff Sheet MS-2014-01603.tif 2009 INTERNATIONAL RESIDENTIAL ITY• OF 13LAIR REROOP . - CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following_ this reroofing job. Property Address. Contractor or Homeowner (if self) Permit #: MS-2014- - L f ' ` . Installation Date: Tl. j YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (P.907:1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) ' ❑ STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are f f capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal cpunter- flashing were not reinstalled if rusted. (8907,5) j SLASHING INSTALLED PROPEF.LY: Flashing shall be reconstructed in accordance with* approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6), // Z- - . s h E Signature bf F ( riffarf nstaller Da e Da / te Signature o er n older