Loading...
Checkoff Sheet MS-2014-01559.tif 2009 INTERNATIONAL RESIDENTIAL CODE RER CHECKOFF SHEET CITY OF BLAIR lair �all prior in inspection 218 S 16 t° �t, tar NE 68008 ecause of I i nations caused by the infeasibility to perform detailed inspections which would not interfere it reroofing work, pleas; indicate compliance with the following requirements i followim this reroofing job. P ermit • I t� k Installation Date, c I YES NO The materials and methods of aplication used for recovering or replacing the existing � roof covering comply with the requirements of the budding code. (8907.1 ) ICE PROTECTION INSTAI I RD: An ice barrier that consists of at lean two layers of � underlayment or of a self - adhering polymer modified bitumen sheet was installed and emends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R9052.y ) k STRU COMPONENTS ARE S?OIJN The structural roof components are � capable of supporting the roof covering system and the material and equipment loads that will be encountered during 'installation of the roof covering system. (8907.2) E i Tlt COVERING A REM Existing roof covering was removed for one of the reasons required by section R907.3 t fiEt3 ETAI FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter4lashing were not reinstalled if rusted. (8907.5) 4 t FLASHING INSTALLED LERLYm Flashing shall be reconstructed in accordance ! with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) r { Signature of Primary Installer Date 3 i ®a Aignare of Permit alder ! r