Checkoff Sheet MS-2014-01559.tif 2009 INTERNATIONAL RESIDENTIAL CODE
RER CHECKOFF SHEET
CITY OF BLAIR lair �all prior in inspection
218 S 16 t° �t, tar NE 68008
ecause of I
i nations caused by the infeasibility to perform detailed inspections which would
not interfere it reroofing work, pleas; indicate compliance with the following requirements i
followim this reroofing job.
P ermit • I t�
k
Installation Date,
c
I
YES NO
The
materials and methods of aplication used for recovering or replacing the existing
�
roof covering comply with the requirements of the budding code. (8907.1 )
ICE PROTECTION INSTAI I RD: An ice barrier that consists of at lean two layers of �
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
emends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R9052.y )
k
STRU COMPONENTS ARE S?OIJN The structural roof components are �
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during 'installation of the roof covering system. (8907.2)
E i Tlt COVERING A REM Existing roof covering was removed for one
of the reasons required by section R907.3
t
fiEt3 ETAI FLASHING. Existing vent flashing, metal edges, drain
outlets, collars or metal counter4lashing were not reinstalled if rusted. (8907.5)
4
t
FLASHING INSTALLED LERLYm Flashing shall be reconstructed in accordance !
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
r
{
Signature of Primary Installer Date
3
i
®a
Aignare of Permit alder !