Loading...
Checkoff Sheet MS-2014-01557.tif i i 2009 INTERNATIONAL RESIDENTIAL CO F SHEET e r>n fair C it prior to Final inspection 218 S 16 Street, Blair, NE 60000 Because of limitations ca used b the infeasibility to (perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the folIowing requirements follbwin this reroofing job. Permit #• i ° I Installation }ate. ° I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) [' ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhedIg polymer modified bitumen sheet was installed and extends of least from the eave'sled. e to a point at least 24 inches inside the exterior wall line of the building. (R905.2 7.'1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that'will be encountered during installation of the roof covering system. (8907,2) EXISTING COVERING ViIAS RE ttOVE ®* Existing roof covering was removed for one of the reasons required by section 8907.3 I NO RUSTED [METAL OR FLASH ING - . . � Existing vent flashing, metal edges, drain outlets, collar's or metal counteV i flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PRD EI2LY, Flashing shall be reconst ru cted in accordance with approved manufacturer's installation instructions. Metal flashing to whin bituminous materials are to be adhered shall be primed prior to installation. (8907.6) I, 1 Signature of Primary Installer Date Date Signature of Permit Holder I I