Checkoff Sheet MS-2014-01024.tif 009 INTERNATIONAL RESIDENTIAL COD.
CITY OF SLAIR RER OPI1 ' CHECKOFF SHEET
'
Return to Blair City Nall prior ta Inspection
Final Ins P
218 S 16 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: is ).
Contractor or Homeowner (if self)
Permit #. M S- 2014- _
Installation Date: j
YE NO
. ❑ The materials and methods of application used for recovering or replacing the existing
roof covering gomply with the requirements of the building code. (P.907:l)
1� ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
• wall line of the building. (8905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are
• o erin s stem and the material and equipment loads
capable of supp�rfi�ng the roof c v � y
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTING COVERING WAS REMOVED'. Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR FLASHING. Existing vent flashing, metal edges,
drain outlets, cogars or metal cpunter- flashing wore not reinstalled if rusted. (8907.5)
❑ FLASHING INSTAL PROPERLY: Flashing shall be reconstructed in accordance
with* approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of P rrha nstaller Date
Signature of er ft Holder
• Date