Loading...
Checkoff Sheet MS-2014-01024.tif 009 INTERNATIONAL RESIDENTIAL COD. CITY OF SLAIR RER OPI1 ' CHECKOFF SHEET ' Return to Blair City Nall prior ta Inspection Final Ins P 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: is ). Contractor or Homeowner (if self) Permit #. M S- 2014- _ Installation Date: j YE NO . ❑ The materials and methods of application used for recovering or replacing the existing roof covering gomply with the requirements of the building code. (P.907:l) 1� ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior • wall line of the building. (8905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are • o erin s stem and the material and equipment loads capable of supp�rfi�ng the roof c v � y that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED'. Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, cogars or metal cpunter- flashing wore not reinstalled if rusted. (8907.5) ❑ FLASHING INSTAL PROPERLY: Flashing shall be reconstructed in accordance with* approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of P rrha nstaller Date Signature of er ft Holder • Date