Loading...
Checkoff Sheet MS-2014-03270.tif i . i C11Y OF BLAIR REROOFING CHFCKOr - F S HEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NB 68008 s Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements To this reroofing job. Permit 4: Installation Date: i YEpr NO Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) d ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) (� ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign ' of Pr' ary Installer Date Signat of Permit Holder Date