Loading...
Checkoff Sheet MS-2014-02257.tif I ZU09 INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET Roturn to lair City all prior to Final Inspection 2 18 S le S treet, B lair, NE 68008 Because of limitations caused by the Infeasibility to perForm detailed Inspe6Hons which would not Interfere with reroofing work, please Indicate complianco with the following requirements following this- reroofing job. Pr'opody Add ►�` Contractor or Homeowner (if self) : +�•� � �.:- — ' - i Permit - 2014_ Installation late: YES No i The materials and methods of application used 1br recovering or replacing the existing roof covering comply with the requlrements of the building code_ (R9O7.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two Dyers of underlaymeniw or of a self- adhering polymer modified bitumen sheet Was Installed and i extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905- 2.7.1) _ STRUCTURAL\ COMPONENTS ARE SOUND: The structural•roof components are capable of supporling the roof covering system and the material and eaulpment loads that will be encountered during installatloh of the roof covering system. (R9O7.2) E STING COVERING WAS REM G+VED: EAsUng roof covering was removed for one of the reasons required by seaon R907.3 DID NOT USE DUSTED mmmt- OR FLASHING; Existing verit flashing, metal edges, drain nude , collars or metal counter-flashing were not reinstalled if rt.isted_ (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall bo moonstrueW in accordance with approved mane acturees installation instructions. Metal flashing to which ;- b minous materials are to be adhered shall be primed prior to installaWn. (11907.6) e a nstall to S lure of p Ho or Da i - I TB /TO 3DVcJ NOIionaiSNOO St' 8966PEZ9T8T VS:6T ©TOZ /ZZ1TT