Checkoff Sheet MS-2015-00165.tif {
2009. INTERNATIONAL RESIDENTIAL COM
CITY OF 13LAIR:REROO'P-.ING'CHECKOFP'S'H
t
Returb.to Blair City _.:.all rzor ', 4 lnal e ti ®
th st reet, Blair, ME 68008
Because of limitations caused by the infeasibility to perform 'detalled inspections which would
not interfere with reroofing work, please indicate compliance with the following'requlrefrtents
following this reroofing job.
e Add
Drop rty ,
Contractor or Homeowner (If self} 3
hermit -2
Installation bate. '.
YES O
The materials and methods of application used for recovering or replacing the existing
roof covering gomply with the requirements of the building code , 48907:1)
ICE PRO EOTION INSTALLED An lee harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
VU
extends at least from the eave's edge to a point at Least 24 inches inside the exterior
wall line of the building. (Ft906.2,7.1) '
STRUCTURAL COMPONENTS ARE SOUND. T.he structural roof camponenfs are
capable of' supporting the; roof cgverlrig systemi and the rnat6rla) and �q ulpment loads
that will be encountered during installation of the, roof covering s'ystem,'(R807,2} I
coverin ` was femoved for bne
EXISTING COVERING UVAS_RE�IOVEC3 = Existing r oof , g
of the reasons required by sectlon R807.0
j DID NOT USE RUSTED METAL OIL FLA.SHING�. Existing vei t fl ashing, metal edges,
drain outlets, collars or metal counter- flash(ng wore not reinstalled if (8907,5}
FLAS' HIND INSTALLED PROFEgLYg Flashing shall be reconstructed in accordance
with approved manufacturer`s installation instructions. fetal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6),
a re ary I ffir ate ;
natur ermlt Holder pale