Loading...
Checkoff Sheet MS-2015-00165.tif { 2009. INTERNATIONAL RESIDENTIAL COM CITY OF 13LAIR:REROO'P-.ING'CHECKOFP'S'H t Returb.to Blair City _.:.all rzor ', 4 lnal e ti ® th st reet, Blair, ME 68008 Because of limitations caused by the infeasibility to perform 'detalled inspections which would not interfere with reroofing work, please indicate compliance with the following'requlrefrtents following this reroofing job. e Add Drop rty , Contractor or Homeowner (If self} 3 hermit -2 Installation bate. '. YES O The materials and methods of application used for recovering or replacing the existing roof covering gomply with the requirements of the building code , 48907:1) ICE PRO EOTION INSTALLED An lee harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and VU extends at least from the eave's edge to a point at Least 24 inches inside the exterior wall line of the building. (Ft906.2,7.1) ' STRUCTURAL COMPONENTS ARE SOUND. T.he structural roof camponenfs are capable of' supporting the; roof cgverlrig systemi and the rnat6rla) and �q ulpment loads that will be encountered during installation of the, roof covering s'ystem,'(R807,2} I coverin ` was femoved for bne EXISTING COVERING UVAS_RE�IOVEC3 = Existing r oof , g of the reasons required by sectlon R807.0 j DID NOT USE RUSTED METAL OIL FLA.SHING�. Existing vei t fl ashing, metal edges, drain outlets, collars or metal counter- flash(ng wore not reinstalled if (8907,5} FLAS' HIND INSTALLED PROFEgLYg Flashing shall be reconstructed in accordance with approved manufacturer`s installation instructions. fetal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6), a re ary I ffir ate ; natur ermlt Holder pale