Checkoff Sheet MS-2014-02726.tif ZUU9 INTERNATIONAL RESIDENTIAL CODE
t 1
CITY-O F'13 LAIR RERob 01 C
R eturn lair y � � : a� '
218 S 16 th S treet, lair , � . ti
Because of limitations caused by the Infeasibility to perform detailed Inspections which world
not interfere with reroofing work, please Indicate compliance with.the following°requirements
following this reroofing job.
Property Address:
Contractor or Homed ner (if self) ,
/ lop ,
Permit #;{`"
Installation Date:
DES NO
The materials and methods of application used fQr recovering or replading the existing
roof covering gomply with the. requirements: ofthe b.gllding coda, (R9071) ry
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
A/i underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the 'eave's'edge to a point at l6ast"24 inches insids tine exledo
wall line of the building (1906.2,7.1)
STRUCTURAL. COMPO NTS ARE SOUND. The structural roof components are
capable of supporting the roof cgvering:system and the materlal,and eggipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERAG WAS REMOVED: Existing roof covering was removed-for b e
of the reasons required W'sectlon R907.3:
DID NOT USE ROSTED.METAI, OR FLA$UING, Existing Vent. iashrng'mef I edges,
;
drain coil " "ets, collars o r metal coranter:flasling wore n reinstalled �f l usted t (R907,)
PLASHING INSTALLED PROPERLY Flashing shall byreconstructed in accordance
with approved 'man ufacturer'si Installation lnstrudons.' etal'flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6), j
l i7aturY n t l` ate
S,g� ore er`