Checkoff Sheet MS-2014-02475.tif I I
I
I
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to lair City Hall prior to Final inspection
218 S 16" Street, Blair, NE 66006
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing yob.
Property Address: q—A -U
contractor or Homeowner (if self) :
Permit #: M -21D .
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (R907.1)
ICE PR,OTE TION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
_ STRiIr C OMPON ENTS AR - QUND: The structural roof components are
Y IL . ; e,sri .-4,i }i,r: r^e%f mewnrinig Cyr-+(Im and tho rrt`d'torlQi and QaLlir)MC -Snt 1691(iQ
that will be encountered during installation of the rouf uuvut ii19 SYZitercl- - (8907
EX COVERING WAS REMOVED: Existing roof oovering was removed for one
of the roaoona roquired by Qoction.R9 -. --
DID NOT USE RU51 LU ;lrltelAL UK Ft_A5HINP -, l;xlsting veijl; rlrabiiincy, intlal vzaua�5,
drain outicto, goliehm or moto oountor- fictshin!3 Wnro not rgkinatallsd if ruPt_ad. kFZ907 AN
�' RSi t1A1G 1NS`I"ALLED ppopg;r?L Y Pk;ks irlo gt)nil brs rot- nnctrii&Pd in accordance
with approved manufacturers inst aiiati on in$trU U'tfutt5. MCLCftj ri Iri 1L) wins;,-
i mat erials are to be adhered. shall be primed prior to installation. (8907.6)
a urary In taller Date
Fi.,id r rata - -
i