Loading...
Checkoff Sheet MS-2014-02141.tif i 04/21/2015 08:00 4025545809 HSCSNT PAGE 01101 "Of"" INTERNATIONAL RESIDENTIAL CODE 1z UU CITY OF BLAIR REROOFING CHECKOFF SHEET I Return to Blair City Hall prior to Final inspection 18 S 16 Street, Bl air, N E 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements foi lowing this reroofing job. Property Address: _ ' Z _ ti Contractor or Homeowner (if self) Nifrnit #: " W - 201y — �-_ Installation Date: YES NO The materials and methods of application used for recovering or replacirto the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at..least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONE1 TS ARE SOUND: The structural roof components are capable of supporting the ro covering system and'the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS RENIOVF - Existing roof covering was removed for one of the reasons, required by section R907.3 DiD NOT USE RUSTED METAL OR F'LASHING:.Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PR0P9RLY: f=lashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) �= a re of primary Installer p i e it Holder Date I