2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to lair ti all prior to Final Inspection
218S16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: 9 1 Al
Contractor or Homeowner (if self) : s
Permit #; S- C3 -
Installation Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components a
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I
Signature of Primary Installer Date
6,4-
SignatLfte of Permit Holder Date