Loading...
Checkoff Sheet MS-2014-01943.tif L i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to lair ti all prior to Final Inspection 218S16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: 9 1 Al Contractor or Homeowner (if self) : s Permit #; S- C3 - Installation Date: YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components a capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I Signature of Primary Installer Date 6,4- SignatLfte of Permit Holder Date