Loading...
Checkoff Sheet MS-2014-01868.tif i I I i 009 iNlFAWA1IC}NIAl- I�?I.Y.KIAL.CODE CRY OF bLAIR K LROOF GlIKKOFF SHEET Return to Blair City Hall prior to Final Inspection j 218S I 6 Street, Blair, NE 68008 j Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements To this reroofing Job. Permit #: ms -aof l- Installation Date: q� YEF NO � The materials and methods of application used for recovering or replacing the existing i roof covering comply with the requirements of the building code. (R907.1) I �I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) (� CI FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal fiashino to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign &6 of Pr' ary Installer Date Signatur6 of Permit Holder Date (, I j I