Loading...
Checkoff Sheet MS-2014-01316 (2).tif I Apr 17 15 01;06p Allison Blaich 402 - 933 -2995 p.2 RESIDEN 2009, INTERNATIONAL � CITY OF 13LAIR REROOPING CHECKOFF SHEET Return to Blair City Hall prior tb Final Ins peGtion 218 S le Street, Blair, HB 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofng work, please Indicate compliance with the following requirainents following this raro- o;r<rng job. µ Property Address: � ° i I Contractor or Homeowner (if self) Permit #: MS-2014- / Installation Data: M. YES N ❑ The materials and methods of application used far recovering or repiaping the existing roof covering comply with the requirements of the building code. (R$307.1) 0 IGE P0,OTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to-a point at least 24 inches inside the exterior • wall line of the building. (R9052.7.1) STRUCTURAL COMPONENTS ARE SOUND', The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) L°7 EXISTIN G0VERIMG WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DiD NOT USE RUSTED METAL OR FLASHI Existing vent flashing, metal edges, drain cutlets, collars or metal cpunter flashing wisre not reinstalled if rusted. (8907.6) FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufac'turer's installafior) instructions. Metal flashing to which bituminous materi_ als are to be adhered shall be primed prior to installation. (R907.6) Z/ ' /7 Signature of Pri ary Installer Date Signature of Permit Holder Date i