Loading...
Checkoff Sheet MS-2015-00236.tif i INTERNATIONAL I I CITY OF , LAIR REROOFING CHECKOFF Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. )� °� Property Address: i�� l Contractor or Homeowner (if self) Permit #: M -20 < I Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing ` roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which j bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig a ' e _ of Primary Installer Da Sig at re of Permit Holder Date I I i