Checkoff Sheet MS-2014-01319.tif I
Apr 14 15 12;25p Allison Blaich 402 - 933 -2995 p.4
CITY OF OLAIR I
4
i
Return to Blair City Hall prior t6 Final Inspection
218 S W Street, Blair, HB 68808
Because of limitations caused by the infeasibility'tp perfbrm detailed Inspections which would
not interfere with reroofing worl€ please indicate compliance with the following requirements
following this reroofing jab. } r "
Property Address: � �D. � �� �; 1 g
Contractor or Homeowner (if self)
Permit# MS- 2014 -
Installation Date:
YES NO
LYTJ _ Cl The materials and methods of application used fo recovering or replacing the existing
roof covering comply with the requirements of the building code, (R907A)
ICE PROTEGTION INSTALLED An ire barrier that consists of at least two layers of
underlaymentor of a self-adhering polymer moditled bitumen sheet was installed and
extends at least from the eave ed a to a point at le ast 24 Inches inside the exterior
-wail line of the building. (R905.2.7.1)
STRUGTURAL COMPONENTS ARE SOUM. The structural roof components are
capable of supporting the roof cornering system and the material and equipment loads
that will be encountered wring installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed forone
of the reasons required by section R907.3
DID NOT USE DUSTED M* OIL FLASHING: Existing vent Mashing, metal edges,
drain{ outle ts, collars or metal counter -r' lashing were not reinstalled if rusted. (R907,5)
FLMHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
biturninous mat pals are to be adhered shall be primed prior to installation. (R907.6)
Signatur rim ry f a'taller Date
I
Signature of Permit Holder Date
• I