Loading...
Checkoff Sheet MS-2014-01319.tif I Apr 14 15 12;25p Allison Blaich 402 - 933 -2995 p.4 CITY OF OLAIR I 4 i Return to Blair City Hall prior t6 Final Inspection 218 S W Street, Blair, HB 68808 Because of limitations caused by the infeasibility'tp perfbrm detailed Inspections which would not interfere with reroofing worl€ please indicate compliance with the following requirements following this reroofing jab. } r " Property Address: � �D. � �� �; 1 g Contractor or Homeowner (if self) Permit# MS- 2014 - Installation Date: YES NO LYTJ _ Cl The materials and methods of application used fo recovering or replacing the existing roof covering comply with the requirements of the building code, (R907A) ICE PROTEGTION INSTALLED An ire barrier that consists of at least two layers of underlaymentor of a self-adhering polymer moditled bitumen sheet was installed and extends at least from the eave ed a to a point at le ast 24 Inches inside the exterior -wail line of the building. (R905.2.7.1) STRUGTURAL COMPONENTS ARE SOUM. The structural roof components are capable of supporting the roof cornering system and the material and equipment loads that will be encountered wring installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed forone of the reasons required by section R907.3 DID NOT USE DUSTED M* OIL FLASHING: Existing vent Mashing, metal edges, drain{ outle ts, collars or metal counter -r' lashing were not reinstalled if rusted. (R907,5) FLMHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which biturninous mat pals are to be adhered shall be primed prior to installation. (R907.6) Signatur rim ry f a'taller Date I Signature of Permit Holder Date • I