Checkoff Sheet MS-2014-01318.tif i
Apr 14 15 12,25p Allison Blaich 402- 933 -2995 p.2
MUM. INTEK' A N N AT 10 A N A L K P ' % ESlu w '% ENTIAL COM
CITY OF 13LAIR REROOP14G . T
Return to Blair City Hail prior to Final inspection
213 I6 Street, Blair, HE 68008
Secause of limitations caused by the infeasibility to perform defailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requireinenfs
f'oilowlnc l this reroofing lob.
Property Address: n A-Z->
Contractor or Homeowner (if self)
Permim MS-2014-ij C C4
Installation D;4tte•
YES NO
jThe materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R9O7.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modiffed bitumen sheet was installed and
extends at least from the eave's edge to •a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPO ARE SCUM— The structural roof components are t
capable of supporting the roof covering system, and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
r= [ST1NG COVERING WAS REMOVEM ! xisting roof covering was removed for one
of the reasons required by section 8907.3
011) NOT USE. RUSTED METAL OR PLASHING.- Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
Q PLASHING INSTALLED PROPERLY: !"lashing shall be reconstructed in accordance
With approved manufacturer's installatio Instructions. Metal flashing to which
bltuminou materials are to be adhered shall be primed prior to installation. (11907.6),
Cigna ure ref nmary lnst r Date
Signature of Permit Holder Date
i