Checkoff Sheet MS-2014-01317.tif i
i
I
I
Apr 14 15 12,25p Allison Blaich 402 - 933 -2995 p.4
2009". INTER"NATION"AL . _ GODE
CITY OF 13LAIR REROOP114G T
Return to Blair City Hall prior to Final Inspection
218 S 'IS Street, Blair, NE 68008
]Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner (if self) ; 1 'Z 7YL
i
Permit #: MS -2014-
installation Date: A .
YES No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the, building code. (R807A)
ICE PRDTEGTION INSTALLED An ice barrier that consists of at least two layers of
underlaymentor of a self-adhering polymer modified bitumen sheet was installed and
Extends at least from the eave ed g to a point at le ast 24 inche inside the exterior
-wall line of the building. (R905.2.7.1)
' STi RUGTURAL COMPONENTS ARE SOUN The structural roof components are r
1 capable of supporting the roof covering system and the material and equipment loads
that will be encountered wring installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for-one
of the reasons required by section R907.3
DID NOT USE- RUSTED METAL OR FLASHING: Existing vent Mashing, metal edges,
drain outre #s, collars or metal cpunter flashing were not reinstalled if rdsted. (R907.5)
. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manuf'acturer's installation instructions. Metal flashing to which j
bituminous mat rials are to be adhered shall be primed prior to installation. (R907.6)
Signatur rim rY lis#ager Date
Signature of Permit Holder Date
I