Loading...
Checkoff Sheet MS-2014-01316.tif i Apr 14 15 12,25p Allison Blaich 402 - 933 -2995 p.3 2009INTERITAT10"ANAAL RESID"ENTIAL COM CITTY OF 1 y Return to lair City Hall prier t6 Final Inspection 218 S I& S treet, Blair, NE 68008 Because of limitations caused by the infeasibility #o perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address; 4:�qO 41.E Contractor or Homeowner (if self) Permit O: MS -2011 4 - rO 13 Installation Data: NC j The materials and methods of appIicafiian used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.'i) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet installed and extends at least from the eavds e dg to -a point at least 24 inc inside the exterior wall line of the building. (RD 06 2.7.1) STRUCTURAL COMPONENTS ARE SOUNU: The structural roof components are t capable d supporting the roof covering system and the material and equipment loads that will be encountered t uring installation of the roof covering system. (R9a7.2) EXISTING COVERING WAS REMOVEg Existing roof covering was removed for one of the reasons required by section R907.3 DID N OT USE. GUSTED METAL OR FLASHING, Existing vent flashing, metal edges, drain outlets, callers or metal cpunter- flashing wore not reinstalled if rusted. (11907.5} FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bite no�ts materials are to be adhered shall be primed prior to installation. {11907,6} S r ary tal[er Date Signature of Permit Holder Date