Loading...
Checkoff Sheet MS-2014-003188.tif i Lc" S ( '3 32c�; CC,' 2015- Apr -13 02:45 PM One Stop Shop 402 -591 -9961 2/2 I 1 ' RESIDE NTIAL CITY OF BLA ! H Return to Biair city Hail prior to Final inspection 218 B Street, Blair, NB 88808 Because of limitations caused by the InfeasIbIlIty to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements faltowtng this- reroofing job. Property Address: A V 2 q - 1 - U_ or Homeowner (itself) permit #: +finn j�� - 2014" ilti — . I stallatlon Date: E NO ❑ The materials and methods of application used for recovering or replacing the existing roof oovering comply with the requirements ofthe building code, .(R907.1) ❑ ICE PROTECTION 1NSTALLE : An Ice barrier that consists of at least two layers of unde'dayrnent or of a self adhering polymer modified bitumen sheet Was installed and extends at Ieast from tl'ie eaye's.od� to a point east 24 inches side the exterior wall line of the building. (11905.2.7.1) ni ❑ STRumpAL C OMPQN ARE S.OUNb. The structurol'roof components are capable of supporting the roof covering system and the material and equ,Ipment loads that will be etrcountbred during Installation of the roof covering system. (R907,2) rzxiSTINO COVERING WAS REMOVED: Existing roof covering waa removed for one of the reasbns required by seotlon R907.3 ` ❑ DID NOT USE RUSTED METAL ORELASHINC. Existing verli flashing, metal edges, i drain outlet's, collars or metal counter- flashing were• not reinstalled if rusted. (R907.5) FLAS I G INSTAt.t.ED PROPE Flashing shall be reconstructed In acdordance with approved manufacturer's installation instruotlons. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.B) Signature of P ' ry Installer Date � �- /J Signature of P rmit Holder Gate