Checkoff Sheet MS-2014-00433.tif Hp r. L, LU 1 LOriai r, I L
2009 INTERNATIONAL R
REROOF CITY OF BLAIR F SHEE
,turn to I ilr City Hall prior to Filial Inspe
218 S 16 treat, Blair, NE 68008
i
Because of limitations caused by the infeasibility to Perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
t
Property Address.
m
Contractor or Homeowner (if self) :
Permit #: d
Installation Date; _
E NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (RS07,1)
ICE PROTECTION _ INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's gds to a point at least 24 inch in ides the exterior
wall line of the building. (8905.2.7.1)
S TRUCTURAL COMPONENTS A RE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED FETAL OR FLASHING, Existing vent flashing, metal edges,
drain outlets, collars or rental counter-flashing were not reinstalled if rusted. (R907.)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with ap ro ed manufacturer's installation instructions. Metal flushing to which
b um
i ous materials are to be adhered shall be primed prior to installation. (R907.6)
ignat W re ;rP ma [� [�at+s / W Cigna ure rmit bolder Date