Checkoff Sheet MS-2014-03272.tif i
i
i
JUN- 01 -2009 02:00 From: To:4024264195 P.1f2
2009 INTERNATIONAL RESIDENTIAL CODE �I
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 18 Street, Blair, NE 88008
k
Because of limitations caused by the infeasibility to perform detailed inspections which would �
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job.
i
i
Property Address:
Contractor or Homeowner (if self) : sE c" � l "
Pon #t: IVIS -20 I L4
' Installation Gate: C1 ,` l
YES NO
pd The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.9)
ICE PROTECTION INSTALLED An ice barrier that - consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen shoot was installed and j
extends at least from the eave's edge to a yoint at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS AIDE SQIJND: The MruiJtural roof components are
lll
..capable of supporting the .roof covering system and the mate'ial and equipment loads j
that will be encountered during installation of the roof covering system. (8007,2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by see 8907.3
i
DID NOT U E METAL. OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter4ashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous mate' s are to be adhered shall be primed prior to installation. (8907.6)
l 7-1
Sigma ure of P ' ary t oiler date
I
S gnature o Wrmi Holder Date
I
i