Loading...
Checkoff Sheet MS-2014-03272.tif i i i JUN- 01 -2009 02:00 From: To:4024264195 P.1f2 2009 INTERNATIONAL RESIDENTIAL CODE �I CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 18 Street, Blair, NE 88008 k Because of limitations caused by the infeasibility to perform detailed inspections which would � not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. i i Property Address: Contractor or Homeowner (if self) : sE c" � l " Pon #t: IVIS -20 I L4 ' Installation Gate: C1 ,` l YES NO pd The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.9) ICE PROTECTION INSTALLED An ice barrier that - consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen shoot was installed and j extends at least from the eave's edge to a yoint at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS AIDE SQIJND: The MruiJtural roof components are lll ..capable of supporting the .roof covering system and the mate'ial and equipment loads j that will be encountered during installation of the roof covering system. (8007,2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by see 8907.3 i DID NOT U E METAL. OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter4ashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous mate' s are to be adhered shall be primed prior to installation. (8907.6) l 7-1 Sigma ure of P ' ary t oiler date I S gnature o Wrmi Holder Date I i