Checkoff Sheet MS-2014-03167.tif JUN- 01 -20 09 02:01 From: To:4024264195 P.2/2
CITY OF I
i
B L A IR REROOFING SH
Return to Glair Char Fall prior to Final Inspection j
218 S 1 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
si- d
Property Addres s: C '1 - 7
Contractor or Homeowner (if self) : "y ( caf
w
Kermit #: IVf$ -2Q
Instillation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barri that�onsfsts of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edce_ to a point a t least 2424 Inches inside the exterior
wall line of the building. (R905.2.7.1)
i
STRUCTURAL COMPONKNTS ARE SOUND The structural roof components are
- capable of supporting the roof covering system and the mateftl and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTiNG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by seq�on R907.3
i
` ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted_ (8907.5)
FLASHING INSTALLED PROPERLY Flashing shall be reconmructed in accordance
with approved nufacturer's installation instructions. Metal flashing to which
bitu inoue erlals are to be adhered shall be primed prior to installation. (8907.6)
1-7
dr
$!gnat of Pri t er Date
Sign re of permit Holder bate
� i