Checkoff Sheet MS-2014-03166.tif JUN -01 -2009 02:07 From: To:4024264195 P.2f2
20"09 1NTE'Kq'61h'4'AT1U'2"1'4'AL _ E e
CIT OF 13LAIR REROOFII CHECKOFF SHEET
Return to Blair Cit Rail prior to Final Inspection
2 18 8 16 Street, Flair, NE 68008 j
Because of limifations caused by the In%asiblllty to perfarrn detailed inspections which would j
II01 interfere with reroofing work, Please Indleata compliance with the following requireMents
f oJig g wing this reroofing job. r I
Property Address:
Contractor or Homeowner (If self}
1
C�e�mlit M 20'f �
[nstalla'Elon bate, 7 •
NO
The materials and methods of application used fqr recovering or replaging the existing
roof covering comply with the require) nelits of the building code. (8907;1)
WE PkOtE OTIQN INSTALLED An loo barrler that consists of at least two layers of
underlayrrient or of a self - adhering polymer modified bitumen sheet MLggj 1s_LgU and
extends at least from the eayda edge to .a point at least 24 Inches inside the exterior
-wall line of the building. (8905.2.7.1)
ST RUMURAAL COMPONEKT -TAME SOUN15m. Tha struotural roof components are r
capshle al9upportilng the roof boyering system and the materlal etnd equipment loads
that will he encountered during installation of the roof covering system, (8907.2)
F - X ISTIMG COVERING WAS REMOY_I~D- Existing roof covering was removed for one
of the reason`s required by section R907.3
IaID N01. USE RUgED METAL OR FLASHING� FzAsting vent flashirig, metal edges,
drain outlets, collArs or metal counter- flashing w6re. not reinstalled If rusted. (8907.5)
9Ld FLA4 I ING IN TA LI_ED_PFWP1;FtLY; Flashing 0hall be reoonstrgoted In accordance
with approved manufabtuWs Installatiog Instructions. Metal flashln' g to which
bituminous materials are to be adhered shall be printed prior to Installation. (11907.6 )
Signet r of ? sta r D to
igi ur mil Holder Date
1 •