Checkoff Sheet MS-2014-02510.tif I
p.4
i
INTERNAT
CITY OF BLAIR REROOFING CHECKOFF SHEET
I
Return to Blair City Hall prior to Final Inspection
218S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to- perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: �� 4
Contractor or Homeowner (if self)
Permit #: MS -20 \ -
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I
I
n ure of Primary nstaller Date
Signature of Permit Holder Date
I
i