Checkoff Sheet MS-2014-02104.tif i
i
I
I
I
2009 INTERNATIONAL RES
i
CITY OF BLAIR REROOFING CHEC FF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused` by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fqU2AIng this reroofing job.
B Aa , -,Uk K)(i---� (,<;/C) oq
Property Address: 1 l I`
Contractor or Homeowner (if self) : 62 3
Permit #: MS -20
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.: (R907.6)
Sig, ature of Primary Installer Date
4 LJ --7 -15
Si nature of Permit Holder Date
I