Checkoff Sheet MS-2014-01279.tif I
i
2009 INT�RNATIONAL RESIDENT
CITY OF BLAIR REROOFINQ CHECOFF SHEET
Return to Blair city Hail prior t6 Find inspection
21 s I Gth Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, pleias indicate compliance with the following requireMents
;following this reroofing job.
Property Address:
Contractor or Homeowner (if self : �' - + ,21 Y
Permit #k: MS -2014- 6 1
Installation Date; `'7 / 5' 1 1-1 �.
YES NO
Fr _ C3 The materials and methods of application used fvr recovering or replaging the existing
roof covering gomply with the requirements of the Building code. (8907:1)
0 ICE MOTtCTi ION I TALLER; An ice barrier that consists of at least two layers Of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave% edge to a point at feast 24 Inches inside the exterior
wall line of the building. (14905.2.7.1)
' STRUCTURAL COMPONENTS ARE SOUNdR The structural roof components are t
capable of Supporting the roof oovering systerxi and the material and equipment loads
that will be encountered during installation of the roof covering system. (I607.2)
EXISTING COVERING W AS REMOVED: Existing roof covering was removed for one �
of the reasons required by section 8907.3
DID NOT USEr RUSTS M TAI, OR FLAWING; Existing vent dashing, metal edges,
drain outrets, collore or metal opunfer flashing were not reinstalled If rusted. (8907.5)
FWHING INSTALLED PR OPERLY , ' Flashing shall bq reconstruotad In accordance
/ th proved manufacturer's installation instructions. Metal flashing to which
ous wat edals are to be adhered shell be primed prior to Installation. (R907,S)
re of Inst filer pate
` b 7 l
gnat e o ermi older Date