Loading...
Checkoff Sheet MS-2014-01279.tif I i 2009 INT�RNATIONAL RESIDENT CITY OF BLAIR REROOFINQ CHECOFF SHEET Return to Blair city Hail prior t6 Find inspection 21 s I Gth Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, pleias indicate compliance with the following requireMents ;following this reroofing job. Property Address: Contractor or Homeowner (if self : �' - + ,21 Y Permit #k: MS -2014- 6 1 Installation Date; `'7 / 5' 1 1-1 �. YES NO Fr _ C3 The materials and methods of application used fvr recovering or replaging the existing roof covering gomply with the requirements of the Building code. (8907:1) 0 ICE MOTtCTi ION I TALLER; An ice barrier that consists of at least two layers Of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave% edge to a point at feast 24 Inches inside the exterior wall line of the building. (14905.2.7.1) ' STRUCTURAL COMPONENTS ARE SOUNdR The structural roof components are t capable of Supporting the roof oovering systerxi and the material and equipment loads that will be encountered during installation of the roof covering system. (I607.2) EXISTING COVERING W AS REMOVED: Existing roof covering was removed for one � of the reasons required by section 8907.3 DID NOT USEr RUSTS M TAI, OR FLAWING; Existing vent dashing, metal edges, drain outrets, collore or metal opunfer flashing were not reinstalled If rusted. (8907.5) FWHING INSTALLED PR OPERLY , ' Flashing shall bq reconstruotad In accordance / th proved manufacturer's installation instructions. Metal flashing to which ous wat edals are to be adhered shell be primed prior to Installation. (R907,S) re of Inst filer pate ` b 7 l gnat e o ermi older Date