Checkoff Sheet MS-2014-01203.tif i
i
JUN -01 -200 02:07 From: To:4024264195 P.1f2
Iff
QTY OF 13LAIR REROOFI k Q 'CHECKbFF
Return to 13 1air City Hall prior t6 Final lnspeOt!On
218 S 1 street, B lair, NE 6808.6
Because of limitations caused by the infeasibility to parfornt detailed inspections whioh would
riot interfere with reroofing work please Indicate cornpliance with the 'following requirements
following this reroofing joky. b k
Property Addreas: � � � 2 72
Cdntractor or Homeowner (if salt);
P arm
Im MS-2014-
lnsfallitlon Data:
Y NO
The materials and methods of application used far recovering or replaQIng the existing
roof covering comply with the requirements of the building code. (1190A)
[OF- photOTiON � I_LED; An ice barrier that consists of at least two layers Of
underfeyment or of a self adhering polymer m odified bitumen d ieet Inst alled and
extenda at least from the eave °s ed�Lq to _a pohit at least 2 41nches inside the exterior
• wall line of the building, (R905.2.7. 1)
STRUCTURAL CO M P ONENTS ARE SOUNQp `r~be structural roof components are
capable of supporting the roof covering system sod the material and E�qulpment leads
that will be encountered during installation of the roof covering aystep. (R907.2)
EXISTS IN(3 COVERING WAS REMOVEDt Existing roof covering was removed For one
of the reasons required by seotlon 8907.3
0117 goT. USEi Rus Ea I E art KA81UNG Existing vent flashing, metal edges,
drab; outrets, col[drs or metal counter- flashing wero not reinstalled if rus ted. (R9.07.5)
FWHINO 1NSTALL.E[? PROPI PILY1 Flashing shall be roconstracted in accordance
with approved manufacturers installation in
etructions. Metal flashing to which
bituminous mater' is are to be adhered shall be primed prier to installation, (R907.6).
Signat rima ai[er Date
r-.- f
ignafure of P rmit Holder ate
I