Checkoff Sheet MS-2014-00889.tif I
JUN - 01 -2009 02:11 From: To:4024264195 P.1.1
2009 INTERNATIONAL RESIDENTIAL CvDE
i
CITY { R REROOFING CHECKOFF SHEET
Return to Blair City Hall prier to Final Inspection
218 S' th Street, Blair, N B 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requiremeRnts
toilowin this reroofing job.
Pioperty Address: F �S
Contractor --
or Homeowner (if self)
Permit 1h MS -20
Installation Date: j
YE NO
® The materiels and methods of application used for recovering or replacing the existing �
roof covering comply with the requirements of the building code. (R907.1)
r
ICE PROTECTION INSTALLED. An ice barrier, that consists of at least two Dyers of
underlayment or of a self- adhering polymer modified *bitumen sheet was Installed and
exterids at least from the eave's edge to a point at fear 24 inc es i nside tlle exterior
wall line of the building. (8905.2,7.1)
STRUCTURA COMR6NENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation & the roof covering system. (8907.2)
I
--❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
'[ - IID NQT USE RUSTED METAL FOR FLASHING: Existing vent flashing, metal edges,
drain outlets, collafs or metal caunter-'flashing were not reinstalled if rusted. (8907.5)
i
FLASHING INSTALLED PR
dPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminou materials to be adhered shall be primed prior to installation. (1907.6)
Signet e f Prim nstaller Date /
Sig u of P mit older - Gate
I
I
i