Loading...
Checkoff Sheet MS-2014-00889.tif I JUN - 01 -2009 02:11 From: To:4024264195 P.1.1 2009 INTERNATIONAL RESIDENTIAL CvDE i CITY { R REROOFING CHECKOFF SHEET Return to Blair City Hall prier to Final Inspection 218 S' th Street, Blair, N B 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requiremeRnts toilowin this reroofing job. Pioperty Address: F �S Contractor -- or Homeowner (if self) Permit 1h MS -20 Installation Date: j YE NO ® The materiels and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) r ICE PROTECTION INSTALLED. An ice barrier, that consists of at least two Dyers of underlayment or of a self- adhering polymer modified *bitumen sheet was Installed and exterids at least from the eave's edge to a point at fear 24 inc es i nside tlle exterior wall line of the building. (8905.2,7.1) STRUCTURA COMR6NENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation & the roof covering system. (8907.2) I --❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 '[ - IID NQT USE RUSTED METAL FOR FLASHING: Existing vent flashing, metal edges, drain outlets, collafs or metal caunter-'flashing were not reinstalled if rusted. (8907.5) i FLASHING INSTALLED PR dPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminou materials to be adhered shall be primed prior to installation. (1907.6) Signet e f Prim nstaller Date / Sig u of P mit older - Gate I I i