Checkoff Sheet MS-2014-00849.tif i
Apr. 0. 2015 2:40PM No. 2360 P. 1
2009 INTERNATIONAL RESIDEN
ITS' OF BLAIR REROOFING CHECKOFF
Return to 131air City Hall prior to Final inspection
218S16 1h street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing joie.
Property Address: V eA�
� I
Contractor or Homeowner (If self) : `C3�
Permit #: MS -20 - -MLLM
Installation Date _
i
YES NO
Q The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building cede. (8907.1)
❑ ICI= PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underl�tyment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905:2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING CDyI =_ RINC WAS REMOVED: Existing roof covering was removed for one j
of the reasons required by section 8907.E �
. I
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, �
drain outlets, collars or meta[ counter - flashing were not reinstalled if rusted_ (R907.5) j
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bit Umi materials are to be adhered shall be primed prior to installation. (R9111,6)
r
i
S' nat re of Pri a lier ate
ignatur o Permi H Ider baCe