Checkoff Sheet MS-2014-03197.tif i
I '
I
f' 00 WT F ANATlUWAL CODE
Gl1YOfs BLAIR KER00FIf
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following thi reroofing job.. J `�
Permit 4- : f V 1 C - �0 �f (� (� " L
Installation Date:
i
YEF NO
� The materials and methods of application used for recovering or replacing the existing I
roof covering comply with the requirements of the building code. (R907.1) I
�1 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
i
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which i
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
-� -�5
Sign Z ' of Pr' ary Installer Date
� I
Signatpr6 of Permit Holder Date
i