Loading...
Checkoff Sheet MS-2014-03197.tif i I ' I f' 00 WT F ANATlUWAL CODE Gl1YOfs BLAIR KER00FIf Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following thi reroofing job.. J `� Permit 4- : f V 1 C - �0 �f (� (� " L Installation Date: i YEF NO � The materials and methods of application used for recovering or replacing the existing I roof covering comply with the requirements of the building code. (R907.1) I �1 ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which i bituminous materials are to be adhered shall be primed prior to installation. (R907.6) -� -�5 Sign Z ' of Pr' ary Installer Date � I Signatpr6 of Permit Holder Date i