Checkoff Sheet MS-2014-02431.tif i
CITY OF . BLAIR REROOFING CHECKOFF SHEET
• I_
2009 INTERNATIONAL RESIDENTIAL CODE Return to lair City Hall to Final inspection
2 18 s i6 s treet, Blair, NE 6600
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fbU2ndffl this reroofing job.
Permit#:
installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a sdlf-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND-. structural roof components are
capable df supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (R907.2)
[� E3tISTING COVERING VICAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907,3
NO RUSTED METAL OR FL ASHING". Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sign ure rimary n r
Date
I
Signature of Permit Holder Date