Checkoff Sheet MS-2014-02426.tif i
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF . BLAIR REROOFING CHECKOFF SHEET
Return to Blair City all prig to inal Inspection
218 s i e street. Blair, NE 680
Because of limitations caused by the Infeasibility to'perform detailed inspections which would
I.
not interfere with reroofing work, please Indicate compliance with the following requirements
fogn[ng this reroofing job.
Permit #: ,
Installation Date:
YES 110
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
I� EXIS MOVED: Existing roof'covering was removed for one
of the reasons required by section R907.3
i
No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain �
outlets, collars or metal counter- flashing were not relnstalled if rusted. (R907.5)
FLASHING INSTALLED PR ®PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Si ure , r Date
Date
Signature of Permit Holder