Loading...
Checkoff Sheet MS-2014-02426.tif i 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF . BLAIR REROOFING CHECKOFF SHEET Return to Blair City all prig to inal Inspection 218 s i e street. Blair, NE 680 Because of limitations caused by the Infeasibility to'perform detailed inspections which would I. not interfere with reroofing work, please Indicate compliance with the following requirements fogn[ng this reroofing job. Permit #: , Installation Date: YES 110 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I� EXIS MOVED: Existing roof'covering was removed for one of the reasons required by section R907.3 i No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain � outlets, collars or metal counter- flashing were not relnstalled if rusted. (R907.5) FLASHING INSTALLED PR ®PERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Si ure , r Date Date Signature of Permit Holder