Loading...
Checkoff Sheet MS-2014-02425.tif . j 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF B L AIR IN G CHECKOFF SH Return to Blair City Half prior to Final inspection 2'18 'i 6 Street, Blair, NE 680 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements foll6m(Ing this reroofing job. Permit #: `� °` —G Y Installation Date: YES NO j The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION CNSTALLED: An ice barrier that consists of at least two layers of g polymer underlayment or of a self- adherin of mer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) j STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q NO RUSTED METAL OR FLASHWG: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) *S r Date Date Signature of Permit Holder i