Checkoff Sheet MS-2014-02425.tif . j
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF B L AIR IN G CHECKOFF SH
Return to Blair City Half prior to Final inspection
2'18 'i 6 Street, Blair, NE 680
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
foll6m(Ing this reroofing job.
Permit #: `� °` —G Y
Installation Date:
YES NO j
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION CNSTALLED: An ice barrier that consists of at least two layers of
g polymer underlayment or of a
self- adherin of mer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1) j
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Q NO RUSTED METAL OR FLASHWG: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
i
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
*S r Date
Date
Signature of Permit Holder
i