Loading...
Checkoff Sheet MS-2014-02142.tif I 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return lair C h a ll prior t final inspection 218 S street. lair NE 6000 Because of limitations caused by the infeasibility to'perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fogoylng this reroofing job. Permit #: C 1 G 1 q installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a solf adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907.2) EXISTING COVERING yVAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED pR ®PERi.Yso Flashing shall be reconstructed in accordance with approved manufacturer's installation instt'uctions. Meta{ flashing to which bituminous materials are to bQ adhered shall be primed prior to installation. (8907.6) Sign r f a r Date Date Signature of Permit Holder i