Checkoff Sheet MS-2014-02038.tif i
2009 INTERNATIONAL RESIDENTIAL
CIS OF BLAIR REROOFING EE
Return t® Blair City 'Haill' prior to Final Inspection
1 t " street, Blair, NE 6800 8
Because of limitations caused by the infeasibility to *perform detailed inspections which would
_
not interfere with reroofing work, please indicate compliance with the following requirements
fol[owin this reroofing job.
Permit 4:
Installation Elate:
YES NO
/fC C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905,2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system, (11907.2)
EXISTING COVERING ilt[AS REMOVED= Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHINGa Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (11907.5)
_`LASHING INSTALLED t'ROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's insfiallatian instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
n ur f Primary Installer Date
Signature of Permit Holder Date
I